01Define
Confirm outlet quantities, cable category, pathway requirements, telecom-room locations, equipment locations, PoE requirements, cable distances, labelling standards and required testing before installation begins.
02Install
Route and support horizontal cabling, terminate patch panels and outlets, organize racks and telecom spaces, apply consistent cable identification and coordinate pathways with the surrounding building infrastructure.
03Verify
Certify applicable permanent links, correct failed results, confirm cable identification and provide organized test records and closeout information for the installed cabling system.